Sunday, September 25, 2011
Catastrophes and Anecdotes
Measure twice, drill once--especially in finished cabinetry. In a rush to apply hardware to the bathroom doors, I drilled a couple of extra holes. Thank goodness for puddy.
Pic to follow...
Progress Notes - Saturday Activities
Some minor accomplishments to Fuchsia 715:
Lime Sherbet (Main Bathroom)
- Hung mirror
- Touch up painting on walls
- Scrubbed Tile
Master Bath
- Hung towel hangers
- Inserted door hardware
Kitchen
- Replaced missing brick in fireplace
- Ran power to Network center
- Ran cable lines to Network center
Bedroom
- Replaced Ceiling Fan
Lime Sherbet (Main Bathroom)
- Hung mirror
- Touch up painting on walls
- Scrubbed Tile
Master Bath
- Hung towel hangers
- Inserted door hardware
Kitchen
- Replaced missing brick in fireplace
- Ran power to Network center
- Ran cable lines to Network center
Bedroom
- Replaced Ceiling Fan
Labels:
Bathroom,
Bedroom,
Electrical,
Kitchen,
Network
Subscribe to:
Posts (Atom)