Monday, August 20, 2012

Finishing Out The Master Bathroom

It's been a couple of years since work commenced in the Master Bathroom, and it still isn't finished. But, it's getting close. The progress note for today lists the remaining tasks that need to be accomplished, and additionally, I have to rewire and and a second vent into the bathroom, and re-insulate the ceiling. On hot Dallas summer days, the room heats up and makes the entire house warm. This is due to the removal of insulation during the shower remodel.  Pics are forthcoming and will be added to this post by the end of the day.

PICTURE NUMBER 1 - Bathroom Starting Point
PICTURE NUMBER 2 - Bathroom Starting Point
PICTURE NUMBER 3 - Post Demolition
PICTURE NUMBER 4 - Progress Point (Flooring)
PICTURE NUMBER 5 - Progress Point (Shower)
PICTURE NUMBER 2 - Progress Point (Shower)
PICTURE NUMBER 2 - Progress Point (Doorway)
PICTURE NUMBER 2 - Progress Point (Doorway)
REMAINING PICTURES - Finished Bathroom






Progress Notes - Sunday 8/19/2012







MASTER BATHROOM
  • Removed Old Pocket Door
  • Prepped Doorway for New Flooring
  • Installed and Removed Flooring
      UPCOMING PLANS
    • Paint New Pocket Door
    • Cut and Reinstall Flooring
    • Hang Shower Handle 
    • Fix Window Sill
    • Stain Flooring
    • Hang Door Frame