It's been a couple of years since work commenced in the Master Bathroom, and it still isn't finished. But, it's getting close. The progress note for today lists the remaining tasks that need to be accomplished, and additionally, I have to rewire and and a second vent into the bathroom, and re-insulate the ceiling. On hot Dallas summer days, the room heats up and makes the entire house warm. This is due to the removal of insulation during the shower remodel. Pics are forthcoming and will be added to this post by the end of the day.
PICTURE NUMBER 1 - Bathroom Starting Point
PICTURE NUMBER 2 - Bathroom Starting Point
PICTURE NUMBER 3 - Post Demolition
PICTURE NUMBER 4 - Progress Point (Flooring)
PICTURE NUMBER 5 - Progress Point (Shower)
PICTURE NUMBER 2 - Progress Point (Shower)
PICTURE NUMBER 2 - Progress Point (Doorway)
PICTURE NUMBER 2 - Progress Point (Doorway)
REMAINING PICTURES - Finished Bathroom
Monday, August 20, 2012
Progress Notes - Sunday 8/19/2012
MASTER BATHROOM
- Removed Old Pocket Door
- Prepped Doorway for New Flooring
- Installed and Removed Flooring
- Paint New Pocket Door
- Cut and Reinstall Flooring
- Hang Shower Handle
- Fix Window Sill
- Stain Flooring
- Hang Door Frame
Sunday, November 20, 2011
Fuchsia's Blue Kitchen (Before Pictures)
Full Kitchen / Nook | West View |
Prep Kitchen / Nook | North View |
Prep Kitchen | West View |
Prep Kitchen | North View |
Kitchen Pantry | South View |
Nook | East View |
Kitchen | Den (West) View |
Friday, November 18, 2011
Weekend Task List
ELECTRICAL
- PRINT UP PANEL IDENTIFIERS
DRAW UP AND SAVE MASTER DIAGRAM OF OUTLETS- PULL WIRE TO LINE ONE
- REPLACE LINE ONE OUTLETS
- ADD NIGHT STAND OUTLETS TO LINE ONE
FIX ELECTRICAL MESS IN GARAGEADD OUTLETS AND SWITCHES TO KITCHEN- PUBLISH MASTER DIAGRAM TO FUCHSIA 715
- FINISH KITCHEN CEILING REPAIR
- TEXTURE KITCHEN CEILING
- TEXTURE KITCHEN WALL
- PRIME/PAINT KITCHEN
- PAINT BRICK FIREPLACE
- PAINT MASTER BATHROOM
- CHALK BATHROOM WINDOW
- BUILD FAUX WALL IN BONUS ROOM
- MOVE GAS LINE IN BONUS ROOM
- BUILD UPPER CABINETS
- HANG UPPER CABINETS
Shopping Lists
PURCHASES TO BE MADE
- IKEA - Small Hand Pulls
- HOME DEPOT - Shower Rod
- HOME DEPOT - Shower Fixture
- HOME DEPOT - White Mortar
- IKEA - Window Blinds
- BED BATH AND BEYOND - Shower Curtain
- HOME DEPOT - Hand Sander
- HOME DEPOT - GFI Switches
HOME DEPOT - Cement Bolt'sHOME DEPOT - Cement Blocks- IKEA - Cabinet End
- HOME DEPOT - Insulation
- HOME DEPOT - Shower extender
- TIME WARNER - Second DVD Box
- TIME WARNER - HBO
Monday, November 14, 2011
Progress Notes - Monday
KITCHEN
- Covered Hardwood Floor
- Taped and Mudded (for the umpteenth time)
Sunday, November 13, 2011
Progress Notes - Sunday Activities
KITCHEN
- Built Two Kitchen Cabinets
- Built Nook For Fridge (Dead Space)